About AVAIO

AVAIO – a next generation developer and operator of sustainable data center. AVAIO is the developer, owner, and operator of the new data center campus currently under development in Brandon, Mississippi.
AVAIO is a team of digital and energy infrastructure professionals who have been responsible for the development, construction and financing of in aggregate more than 700 MW of data center capacity and over seven gigawatts of power & energy projects around the world. AVAIO, develops, owns, and operates hyperscale data center campuses and critical IT infrastructure.
AVAIO engages customers, utilities, and local communities early, shares unbiased facts and communicates in clear technical language. Whether AVAIO is working with a hyperscaler, a grid operator or a city, the goal is the same: a solution everyone can understand and rely on.
The Project
The current project underway is an initial $6 billion investment made by AVAIO and its partners during Phase 1 of the project. This is the largest economic development project in the history of Rankin County and when announced was the third largest investment in the history of Mississippi. This project will contribute significant fiscal benefits to Rankin County School District, the City of Brandon, and Rankin County. When operational, with Phase 1, AVAIO will pay the largest ad valorem tax bill in Rankin County by nearly 10 times.
This investment also creates substantial new workforce development opportunities for citizens of Rankin County, tapping into the large professional labor pool of metro Jackson from construction through operations of the facility. Once operational, Phase 1 of this project is expected to create more than 60 new full-time permanent operations jobs. In addition, the construction phase will bring thousands of new jobs in the region and a much broader impact to the regional economy.
The Location
East Metropolitan Industrial Center (EMC) in Brandon, is a premier, 1,133-acre industrial park strategically positioned at the “Crossroads of the South” near the intersection of Interstate 20 and Interstate 55. An Entergy Qualified Site, located just four miles from the Jackson-Medgar Wiley Evers International Airport, the park features exceptional multimodal connectivity, including on-site CPKC rail access, and utilities in place.
Originally home to a limestone rock quarry over 50 years ago, Rankin First has owned the EMC Park for over 30 years for the development of the industrial park.
Designed to accommodate advanced manufacturing, industrial operations, distribution, data centers, and corporate headquarters, the EMC boasts robust infrastructure and transportation access. The park has become a major hub for high-impact regional investment, serving as the home for major industrial projects like Brown Bottling Group, General Motors, the MS Army National Guard, International Paper’s new $225 million sustainable packaging facility, and the multi-billion-dollar AVAIO data center campus.
The Design

AVAIO prioritizes integrating its facilities into communities with minimal impact. Designed as a next-generation digital campus, the development features world-class architecture buffered from neighboring parcels by natural forest and landscaped terrain. The AVAIO design incorporates intelligent, high-efficiency sustainable elements, integrating features such as water-efficient cooling technologies, rainwater recapture systems, rooftop solar generation, and advanced cooling-system economization to reduce overall power demand. Together, these elements position the Brandon campus as one of the most forward-leaning and community conscious digital infrastructure developments in the region and the nation.
Community Benefits
Phase 1 of this project is expected to create over 60 permanent, high-paying operational jobs, along with thousands of construction jobs. Phase 1 of the project will draw 116 MW of power, contributing to local utilities like Entergy Mississippi in a way that is expected to lower utility costs for local residents. Like other large industrial customers, AVAIO covers their cost for energy infrastructure. The project includes sustainable features, including water-efficient cooling systems, rainwater recapture, and rooftop solar. The campus is designed with natural forest buffers to minimize visual impact on neighboring areas. Over time, the site will have hundreds of permanent jobs.
What will the tax revenues from this project support?
When operational with Phase 1, AVAIO will be the largest taxpayer in Rankin County, paying well in excess of $10M annually in property taxes, sitting on just 0.02% of land in Rankin County. These funds will directly support investments into:
- Rankin County Public Schools
- City of Brandon Police and Rankin County Sheriff’s Dept.
- Rankin County Libraries
- Rankin County and Brandon Roads
- City and County Parks
- Other public services
Frequently Asked Questions
Data centers are the physical engine room of the internet and the modern digital economy. From the outside, they look like standard industrial warehouses, but inside, they house thousands of powerful servers that store and process nearly everything we do online. Think of a data center as a high-tech digital library, instead of checking out physical books, you are accessing websites, streaming videos, or sending emails. These secure facilities keep critical information flowing 24/7, powering everything from online banking and GPS navigation to emergency services and healthcare diagnostics.
- AVAIO has engaged early with local stakeholders and views community partnership as fundamental to responsible development. That includes Hinds Community College and both Rankin and Pearl School Districts CTE programs, veterans hiring program, biodiversity initiatives, and a commitment to transparency with elected officials and community members.
- The campus is designed to be buffered from surrounding properties by natural forest and landscaped terrain. AVAIO has engaged with state elected officials and has stood up a Community Advisory Group for transparency and collaboration with the community and other local leaders and remain committed to addressing questions as they arise.
- The Community Advisory Group has been an essential part of the AVAIO’ Digital’s community engagement, as they develop new facilities in various regions across the nation.
- AVAIO has a desire to focus on environmental stewardship with AI beehives that will be housed on site. These AI-powered analytics will help help save bees through AI and data science as bees are disappearing at an alarming rate.
- Operational noise at the property line is designed to be equivalent to a normal conversation. AVAIO proactively commissions noise studies and incorporates sound mitigation design to every facility to meet current noise levels at property boundaries.
- An independent noise study found existing ambient sound levels near the closest residential neighborhood range from 42-56 decibels. These current readings are caused by traffic, households, commercial activities, etc.
- The same study found that, once built, the campus is expected to keep sound at the property line within the City’s codified noise requirements. The study found that the AVAIO campus will not add measurably to those existing levels.
- Backup emergency generators are enclosed, muffled, and tested for fewer than 50 hours per year, during daytime hours only, one-at-a-time, using best-in-class emissions controls.
- The campus includes a park-like setting with substantial landscaped buffers, screening vegetation, and “Dark-Sky” compliant lighting.
- Additionally, like all other businesses in the community, as part of the City of Brandon ordinances, there are decibel requirements that must be met to ensure compliance with local laws and AVAIO is held to the same standards.
- Backup diesel generators are maintained to ensure continuity of service during emergencies and loss of power. Hospitals, government systems, and essential services all depend on cloud infrastructure, so the data center must stay online. On average, generators are used for no more than 30 minutes in a typical month, primarily for brief maintenance testing. They are not a source of ongoing air emissions under normal operations. AVAIO’s facilities are designed to meet or exceed all applicable air quality standards.
- Additionally, Mississippi Department of Environmental Quality “MDEQ” must provide approval for air emissions permits and AVAIO must meet these requirements.
- If needed, as the facility grows in future phases, like all businesses, AVAIO will have to receive MDEQ and other applicable governing bodies approval for any necessary air permits.
- No. New, large industrial customers help pick up a larger share of the cost to improve the grid. Costs that families and small business customers would otherwise have to pay alone. AVAIO will pay all interconnection costs to serve their needs. In doing so, AVAIO is benefiting ratepayers by enhancing the grid.
- Entergy, the power provider for AVAIO, has also issued a “Fair Share Plus” pledge aligning with the White House’s Ratepayer Pledge, which calls for companies to pay for their own power supply, infrastructure upgrades, and even for unused capacity to avoid passing costs to households. Additionally, Entergy has also signed on to the White House’s Ratepayer Pledge.
- Entergy’s Fair Share Plus pledge protects all customers from risks through contractual conditions designed to prevent undue electricity bill inflation. These customer protections include prepayment requirements, multi-year contract terms, credit and collateral requirements, and early termination penalties. Entergy’s pledge also ensures large-load projects, particularly data centers and other power-intensive facilities, create net benefits for everyone Entergy serves. These customers must pay the full costs for service and contribute additional value that lowers costs for existing customers on the grid.
No, AVAIO does not use much water on its closed-loop cooling system. The facility also utilizes water-efficient cooling technology with rainwater recapture and cooling-system economization. AVAIO pays for all water and sewer infrastructure required to support the campus, creating additional revenue for the utility rather than a burden on existing customers.
At full build-out, the initial phase is designed to draw less water than roughly 5 acres of irrigated cropland, or fewer than 23 homes.
City of Brandon sets rates based on the cost of providing service to different customer types. Large customers, such as data centers, add water demand without requiring a proportional increase in system-wide infrastructure. Revenue from large users supports system maintenance, debt service and infrastructure investments, helping keep rates stable and reducing cost pressure on residential customers.
- The Brandon Water Department, a division of the City of Brandon Public Works Department, is responsible for providing safe drinking water to Brandon, Mississippi residents. Drawing water from the Sparta and Cockfield formation aquifers, the department operates 10 wells, 4 water tanks, and 33 lift stations to distribute water throughout the city. The department’s services include water distribution, maintenance, and repair of water mains, fire hydrants, water meters, and service lines. Consistently ranked as one of the top water utilities in Mississippi, the Brandon Water Department is committed to providing quality customer service and ensuring the delivery of clean, safe drinking water to the community.
- Each proposed data center is reviewed through City of Brandon’s engineering and planning process to ensure supply and capacity before service is approved. Providing safe, reliable water for residential customers remains City of Brandon’s top priority, supported by strong watershed protection and long-term planning.
- The Brandon data center hub uses water-efficient cooling technology with rainwater recapture and cooling-system economization.
- At full build-out, the initial phase is designed to draw less water than roughly 5 acres of irrigated cropland, or fewer than 23 homes.
- AVAIO invests in local water conservation programs intended to return more water benefit to Rankin County than the campus consumes.
- All water and sewer infrastructure required for the campus is paid for by AVAIO, zero cost to existing ratepayers.
- In future phases, AVAIO is working on cooling solutions that could utilize gray water that otherwise would be dumped into our rivers and streams.
- The AVAIO Data Center campus in Brandon is being designed to meet Green Globes green building standards and built to Dark Sky Certification standards, with all exterior lighting directed downward to protect the natural nighttime environment. AVAIO’s sustainable design elements include water-efficient cooling, rainwater recapture, rooftop solar generation, and cooling-system economization to reduce overall power demand. U.S. data centers as an industry now account for approximately half of all U.S. corporate clean energy procurement.
- AVAIO has developed a partnership with Urban Bee Lab to install AI run beehives on site.
Some data centers produce sound primarily from cooling systems that circulate air to keep servers at safe operating temperatures. AVAIO designs and operates every campus to minimize sound impact on neighbors, using site-specific acoustic modeling, quiet equipment, and generous buffer zones. Data centers are required to follow city ordinances for noise levels. Every project includes an expert acoustical study to model and minimize any impact on the surrounding area.
An independent noise study found existing ambient sound levels near the closest residential neighborhood range from 42-56 decibels. These current readings are caused by traffic, households, commercial activities, etc.
The same study found that, once built, the campus is expected to keep sound at the property line within the City’s codified noise requirements. The study found that the AVAIO campus will not add measurably to those existing levels.
The initial phase of this project will create 60 high-wage jobs, scaling to 300 permanent on-site positions at full buildout. But the true economic impact extends far beyond the facility gates.
In economic development, these are primary jobs, positions that bring in new dollars into Rankin County rather than simply circulating existing local dollars. Every primary job acts as a economic catalyst: in the data center sector, each direct position creates 4 to 5 indirect jobs across our community, driving high-value contracts for local trades and sustained growth for all businesses across Rankin County.
A data center serves as a catalyst for ensuring our local workforce is ready for jobs of the future, by introducing specialized technical roles during both construction and long-term operations.
Accessible Technical Pathways: Many of these positions pay well above the regional average through 2-year technical degrees, certifications, or trade apprenticeships.
High-Wage Local Careers: Creates long-term demand for electricians, pipefitters, fiber optic technicians, control engineers, and data center operations specialists.
Keeping Talent Local: Gives students graduating from local technical schools and community colleges path-to-employment options so they don’t have to leave the county for high-paying jobs.
Yes, AVAIO expects for the majority of jobs to be filled by Rankin County area residents. If interested in career fields, Hinds Community College and the Central Mississippi Planning and Development District and its partners are hosting training classes to support the data center industry in Central Mississippi.
- Across the country, the digital economy and society’s dependence on technology is growing at an incredible rate and electricity demands are growing with it. Our daily lives and modern economy are powered by digital services like streaming, online shopping and apps. Data centers are necessary to store, process, and manage all the data behind these services. With more connected devices and the rise of new technologies this growth means data centers need more energy to meet consumer demands.
- AVAIO in Rankin County will be a vital part of the ongoing digital transformation, supporting the services we all rely on. This new facility also provides significant benefits to the power grid.
- Electric grids operate on economies of scale. When a large, dedicated customer like AVAIO joins the grid, they help cover the cost of maintaining and upgrading shared infrastructure. The more industrial customers like AVAIO on the power grid in Entergy Mississippi’s service area, the better for residential customers. That’s because large industrial customers are paying a greater share of the power generation and grid costs that everyone uses. And that helps keep electricity reliable and affordable for everyone.
No. Entergy Mississippi’s agreements with data center customers have been structured to benefit all customers while also protecting existing customers from risks. Consistent with Entergy’s Fair Share Plus pledge, Entergy has ensured provisions in their customer agreements like prepayment requirements, multi-year contract terms, credit and collateral requirements, and early termination penalties to protect existing customers.
Customer contracts that include customer-specific provisions and ensure protections and benefits for all other customers must be reviewed and approved by the Mississippi Public Service Commission (MPSC). Entergy has recently filed a contract with the MPSC for its review and approval to serve AVAIO in Brandon that includes specific provisions requiring the customer to pay all interconnection costs to serve their needs. The agreement between Entergy and AVAIO was approved by the MPSC.
Binding contractual provisions in customer agreements such as early termination penalties are specifically designed to protect existing customers in the case a customer closes or reduces operations.
First, AVAIO had to acknowledge that it would adhere to all local zoning laws, rules, and regulations. The chosen site at the East Metropolitan Center Industrial Park was already properly zoned for the planned use. AVAIO must also follow proper building permit process like any other private company. Finally, AVAIO’s sustainable design methods not only ensure the project complies with local requirements but also minimizes its environmental impact on the community.
The AVAIO data center campus highlights how a community can attract world-class companies by making strategic, long-term infrastructure investments. Brandon’s approach serves as a model for how to prepare for and win major economic development projects that will benefit the community for decades to come.
The Mississippi Department of Environmental Quality (“MDEQ”) has jurisdiction over air permits in the State of Mississippi. Like all companies, AVAIO must meet the standards set forth by state law and DEQ. As needed, AVAIO will have to apply for and meet the standards set forth by MDEQ.
Tax incentives are critical to winning high-impact economic development projects in today’s competitive landscape. Thousands of municipalities across the country actively compete for the same high-impact projects. Because data centers represent massive capital investments, state and local tax incentives are often a deciding factor. Offering competitive tax policies allows a community to stand out, win primary jobs, and lock in long-term revenue for local schools and public services.
- Unmatched Capital Investment: Data centers involve billions in initial infrastructure and continuous equipment upgrades. Equipment tax exemptions make a site financially viable for long-term operations.
- High-Value Multipliers: Data centers generate 4 to 5 indirect jobs for every direct role, creating steady demand for local contractors, electricians, utility operators, and Main Street businesses.
- Fierce Competition: Communities nationwide compete every day for industrial project, data centers, and other private investment that brings primary jobs to a community. Offering competitive, state-level incentive frameworks ensures our region stands out and secures the long-term tax base benefits primary jobs provide.
Economic Impact
Data centers produce substantial tax revenue and frequently rank among the largest taxpayers in their communities, even when incentives are part of the equation.

01
Once operational with Phase 1, AVAIO will be the largest taxpayer in Rankin County, and will pay well over $10M annually in property taxes. These taxes will be paid to Rankin County School District, City of Brandon, and Rankin County. Minimum tax revenue requirements have also been built into the project agreements. For perspective, the top 10 taxpayers in Rankin County collectively “in total” pay approximately $6.65M.
02
Compared to many other large scale commercial and investment projects, data centers typically generate a stronger net fiscal benefit for local governments. They require fewer public resources such as school capacity, emergency response, and road maintenance, while still contributing significant tax revenue.
03
AVAIO is expected to be the largest taxpayer in Rankin County, providing significant funding to public entities such as City of Brandon, Rankin County and Rankin County School District. These tax revenues will directly support local infrastructure, schools, parks, and other community assets that all citizens utilize.
Facts about Utility Rates
When large data centers move to Entergy’s service area, all customers that are connected to the grid benefit. In fact, every new large customer added to the system helps pick up more of the grid maintenance improvement costs that existing customers would otherwise have to bear alone, and at a larger share than residential and small business customers.
- $2B+ in savings for our Mississippi customers
- Entergy Mississippi is powering major data center projects that will deliver more than $2 billion in savings to our customers over the next two decades.
- This new data center investment is a testament to the City of Brandon’s proactive planning for major industrial and commercial growth. Specifically at the East Metropolitan Center, through a partnership with the City of Brandon, Rankin First, and other entities, major sewer and water system upgrades have already been installed at no cost to the local rate payers. Multiple grant and additional funding opportunities have been applied for to support the continued buildout of the business park.
- New data center design features will reduce overall water and sewer system impacts, aligning with Brandon’s commitment to supporting economic development while also being mindful of its resources.
- The City’s water and sewer systems are robust and reliable. By investing in infrastructure, the City has consistently met the needs of all its residential and commercial users, providing high-quality, dependable service to everyone in the community.
- The City of Brandon has been proactive in investing in its water and sewer infrastructure, and welcoming new users to the system is a strategic way to manage costs. By bringing on a major customer like AVAIO Digital, the city can spread out the expenses of these infrastructure improvements over a larger customer base. This approach benefits everyone by helping to keep rates stable while supporting the City’s long-term growth and economic development.
Workforce Information

Jobs in the data center industry are “jobs of the future” serving as the foundational infrastructure for cloud computing, artificial intelligence, and the next generation of global technology. For our region, securing these investments is not just about keeping pace, it is about ensuring that Rankin County and central Mississippi capture our rightful share of the digital economy. These positions provide highly stable, high-wage careers for local tech professionals, engineering specialists, and skilled tradespeople like electricians and HVAC technicians. By aggressively positioning central Mississippi to win these data center projects, we lock in decades of technology-driven employment resilience and ensure our workforce remains at the absolute forefront of tomorrow’s economy.
Click below to learn more about what Build Mississippi, CMPDD, and Hinds Community College, are doing to help train central Mississippi residents to support this industry.
Interested in Being a Vendor?
Complete the form below to be considered as a vendor partner.
Construction Job Openings
Follow the link below to see open positions at this data center.
What is a AI?
Our modern lives leverage numerous technological innovations to bring ease and accessibility to our day to day. Data centers are a key enabling component of this, providing technology services that build out these capabilities. AVAIO’s data centers help serve millions of active customers: they keep your information safe and instantly available, powering everything from texts to streaming to school lessons, banking and even hospital care to better help patients. See below for how different parts of our community can benefit from data centers.

Family of Four
- Parents stream different Netflix shows while children play online games
- Smart home devices (thermostats, security cameras, baby monitors) connect to cloud services
- School assignments submitted through learning management systems

Students
- Access course materials and submit assignments through university platforms
- Orders food delivery apps
- Uses social media platforms

Empty-Nesters
- Video calls with children and grandchildren
- Online banking and bill payments
- Medical portal access for healthcare records and appointments

First Responders
- Improve situational awareness and real-time decision-making during emergencies
- Help dispatchers analyze live traffic, road conditions, and hazards
- Suggest faster and safer response routes
- Assist teams in prioritizing search areas to reduce response times
- Enhance responder safety by identifying potential risks on scene
- Support coordination with nonprofits and partner organizations during disaster response

Farmers
- Support smarter, more efficient decision-making in crop and resource management
- Use precision agriculture tools to improve crop monitoring and yields
- Reduce chemical use through smart sprayers and targeted applications
- Monitor livestock health with AI-assisted tracking systems
- Improve water conservation through automated irrigation and demand-based watering
- Detect leaks early through smart irrigation and monitoring technology
- Optimize resource allocation to maximize productivity and efficiency

Sports Teams
- Provide AI-powered insights to support coaching and training decisions
- Analyze athlete performance mechanics and movement patterns
- Assist with injury prevention and recovery planning
- Support game strategy and opponent analysis
- Enhance scouting and recruiting with deeper performance data
- Provide additional analytics to complement (not replace) human evaluation
Thank you for your time and consideration of this information. If you have any questions or would like to discuss these economic development opportunities further, please do not hesitate to reach out directly to our office at (601) 825-5335 or Info@RankinFirst.com.